Revision history of "Translations:AY Honors/Large Rustic Constructions/Requirements/9/es"

From Pathfinder Wiki

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 18:44, 9 November 2025W126jep talk contribs 143 bytes +143 Created page with "</noinclude>¿Cómo se debe lograr una línea vertical perfecta en una estructura de al menos cuatro metros, ya sea enterrada o no? <noinclude>"