Grands bâtiments rustiques
Niveau d'aptitude
3
An
2025
Version
03.09.2026
Autorité approbatrice
South American Division
Aperçu
La partie difficile
Les condition la plus difficile de cette distinction est probablement la suivante:
13. Complete at least three of the following projects. In all cases, there must be appropriate decoration with club elements, lighting, correct placement of flags and patriotic symbols, and a sign/identification plaque for the club/field/union:
- a. A tower at least 4 meters high, not counting the height of the flagpoles, with a surface area of at least 2 x 2 meters, for your club's camp.
- b. An entrance gate for your Pathfinder Club at an Conference or Mission event at least 4.5 meters high, not counting the height of the flagpoles, with a surface area of at least 2 x 3 meters.
- c. A gate, tower, or flagpole for raising flags at an Conference/Mission event at least 5 meters high, not counting the height of the flagpoles, and with a surface area of at least 9m².
- d. A gate, tower, or flagpole for your Conference/Mission at a Union event at least 5.5 meters high, not counting the height of the flagpoles, and with a surface area of at least 10m².
- e. Large-scale structure for your Union at a Division event, at least 6 meters high, not including the height of the flagpoles, and at least 12m² in size.
Categories:
- Pages using DynamicPageList4 parser function
- Pages using DynamicPageList4
- Has insignia image/fr
- AY Honors/HonorLanding/fr
- AY Honor Categories/Recreation/fr
- AY Honors/Recreation/fr
- AY Honors/Introduced in 2025/fr
- AY Honors/Skill Level 3/fr
- AY Honors/Approved by South American Division/fr
- Uses HonorLanding Template
- Missing Localization/All/Large Rustic Constructions AY Honor.png/fr
- Missing Localization/HonorTitle/name/fr

