AY Honors/Knot/Mooring hitch

From Pathfinder Wiki
< AY Honors
Revision as of 20:08, 1 August 2006 by Jomegat (talk | contribs) (created template)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
  1. Take the line to the ear of the cleat furthest from where the line comes from the boat (or load).
  2. Take one wrap around the base of the cleat and then start a figure eight across the top of the opposite ear.
  3. Finish with a half hitch turned under so that the line is coming away from the cleat in the opposite direction from which it came in.

Knot cleat.jpg