<b>1. <translate><section begin=req1 />Describe the function of the following tools: 
+
{{RequirementsHeader{{GetLangSuffix}}}}
<section end=req1 /></translate></b>
 
  
:<b>a. <translate><section begin=req1a />Band Saw 
+
<section begin=Body />
<section end=req1a /></translate></b>
 
  
:<b>b. <translate><section begin=req1b />Belt Sander 
 
<section end=req1b /></translate></b>
 
  
:<b>c. <translate><section begin=req1c />Jig Saw  
+
<b>1. <section begin=req1 /><noinclude><translate></noinclude>Describe the function of the following tools:  
<section end=req1c /></translate></b>
+
<noinclude></translate></noinclude><section end=req1 /></b>
  
:<b>d. <translate><section begin=req1d />Miter Saw   
+
:<b>a. <section begin=req1a /><noinclude><translate></noinclude>Band Saw   
<section end=req1d /></translate></b>
+
<noinclude></translate></noinclude><section end=req1a /></b>
  
:<b>e. <translate><section begin=req1e />Radial Arm Saw  
+
:<b>b. <section begin=req1b /><noinclude><translate></noinclude>Belt Sander  
<section end=req1e /></translate></b>
+
<noinclude></translate></noinclude><section end=req1b /></b>
  
:<b>f. <translate><section begin=req1f />Router  
+
:<b>c. <section begin=req1c /><noinclude><translate></noinclude>Jig Saw  
<section end=req1f /></translate></b>
+
<noinclude></translate></noinclude><section end=req1c /></b>
  
:<b>g. <translate><section begin=req1g />Shaper  
+
:<b>d. <section begin=req1d /><noinclude><translate></noinclude>Miter Saw  
<section end=req1g /></translate></b>
+
<noinclude></translate></noinclude><section end=req1d /></b>
  
<b>2. <translate><section begin=req2 />Demonstrate how to use the following tools:  
+
:<b>e. <section begin=req1e /><noinclude><translate></noinclude>Radial Arm Saw  
<section end=req2 /></translate></b>
+
<noinclude></translate></noinclude><section end=req1e /></b>
  
:<b>a. <translate><section begin=req2a />Block Plane  
+
:<b>f. <section begin=req1f /><noinclude><translate></noinclude>Router  
<section end=req2a /></translate></b>
+
<noinclude></translate></noinclude><section end=req1f /></b>
  
:<b>b. <translate><section begin=req2b />Circular Saw (cut a straight line)  
+
:<b>g. <section begin=req1g /><noinclude><translate></noinclude>Shaper  
<section end=req2b /></translate></b>
+
<noinclude></translate></noinclude><section end=req1g /></b>
  
:<b>c. <translate><section begin=req2c />Framing Square  
+
<b>2. <section begin=req2 /><noinclude><translate></noinclude>Demonstrate how to use the following tools:  
<section end=req2c /></translate></b>
+
<noinclude></translate></noinclude><section end=req2 /></b>
  
:<b>d. <translate><section begin=req2d />Hammer  
+
:<b>a. <section begin=req2a /><noinclude><translate></noinclude>Block Plane  
<section end=req2d /></translate></b>
+
<noinclude></translate></noinclude><section end=req2a /></b>
  
:<b>e. <translate><section begin=req2e />Hand Saw (cut a straight line)   
+
:<b>b. <section begin=req2b /><noinclude><translate></noinclude>Circular Saw (cut a straight line)   
<section end=req2e /></translate></b>
+
<noinclude></translate></noinclude><section end=req2b /></b>
  
:<b>f. <translate><section begin=req2f />Level  
+
:<b>c. <section begin=req2c /><noinclude><translate></noinclude>Framing Square  
<section end=req2f /></translate></b>
+
<noinclude></translate></noinclude><section end=req2c /></b>
  
:<b>g. <translate><section begin=req2g />Measuring Tape  
+
:<b>d. <section begin=req2d /><noinclude><translate></noinclude>Hammer  
<section end=req2g /></translate></b>
+
<noinclude></translate></noinclude><section end=req2d /></b>
  
:<b>h. <translate><section begin=req2h />Nail Set  
+
:<b>e. <section begin=req2e /><noinclude><translate></noinclude>Hand Saw (cut a straight line)  
<section end=req2h /></translate></b>
+
<noinclude></translate></noinclude><section end=req2e /></b>
  
:<b>i. <translate><section begin=req2i />Plumb Bob  
+
:<b>f. <section begin=req2f /><noinclude><translate></noinclude>Level  
<section end=req2i /></translate></b>
+
<noinclude></translate></noinclude><section end=req2f /></b>
  
:<b>j. <translate><section begin=req2j />Wood Chisel  
+
:<b>g. <section begin=req2g /><noinclude><translate></noinclude>Measuring Tape  
<section end=req2j /></translate></b>
+
<noinclude></translate></noinclude><section end=req2g /></b>
  
<b>3. <translate><section begin=req3 />Describe the use of and distinguish between the following types of nails: 20 Penny, 16 Penny, 12 Penny, 8 Penny, 6 Penny, Finish, Brad, Roofing, Screw Nail, Sinker, Common, and Galvenized  
+
:<b>h. <section begin=req2h /><noinclude><translate></noinclude>Nail Set  
<section end=req3 /></translate></b>
+
<noinclude></translate></noinclude><section end=req2h /></b>
  
<b>4. <translate><section begin=req4 />Assist in erecting a building not less than 6x8 feet in ground dimensions with a gable roof and at least one door and one window, demonstrating ability to measure and use tools from requirement 2.  
+
:<b>i. <section begin=req2i /><noinclude><translate></noinclude>Plumb Bob  
<section end=req4 /></translate></b>
+
<noinclude></translate></noinclude><section end=req2i /></b>
  
<b>5. <translate><section begin=req5 />When building the above project, use all of these features:  
+
:<b>j. <section begin=req2j /><noinclude><translate></noinclude>Wood Chisel  
<section end=req5 /></translate></b>
+
<noinclude></translate></noinclude><section end=req2j /></b>
  
:<b>a. <translate><section begin=req5a />Floor Joist
+
<b>3. <section begin=req3 /><noinclude><translate></noinclude>Describe the use of and distinguish between the following types of nails: 20 Penny, 16 Penny, 12 Penny, 8 Penny, 6 Penny, Finish, Brad, Roofing, Screw Nail, Sinker, Common, and Galvenized 
<section end=req5a /></translate></b>
+
<noinclude></translate></noinclude><section end=req3 /></b>
  
:<b>b. <translate><section begin=req5b />Sub Floor  
+
<b>4. <section begin=req4 /><noinclude><translate></noinclude>Assist in erecting a building not less than 6x8 feet in ground dimensions with a gable roof and at least one door and one window, demonstrating ability to measure and use tools from requirement 2.  
<section end=req5b /></translate></b>
+
<noinclude></translate></noinclude><section end=req4 /></b>
  
:<b>c. <translate><section begin=req5c />Shoe Plate  
+
<b>5. <section begin=req5 /><noinclude><translate></noinclude>When building the above project, use all of these features:  
<section end=req5c /></translate></b>
+
<noinclude></translate></noinclude><section end=req5 /></b>
  
:<b>d. <translate><section begin=req5d />Top Plate 
+
:<b>a. <section begin=req5a /><noinclude><translate></noinclude>Floor Joist
<section end=req5d /></translate></b>
+
<noinclude></translate></noinclude><section end=req5a /></b>
  
:<b>e. <translate><section begin=req5e />Double Plate  
+
:<b>b. <section begin=req5b /><noinclude><translate></noinclude>Sub Floor  
<section end=req5e /></translate></b>
+
<noinclude></translate></noinclude><section end=req5b /></b>
  
:<b>f. <translate><section begin=req5f />Conventional Roof or Trusses  
+
:<b>c. <section begin=req5c /><noinclude><translate></noinclude>Shoe Plate  
<section end=req5f /></translate></b>
+
<noinclude></translate></noinclude><section end=req5c /></b>
  
:<b>g. <translate><section begin=req5g />Felt Roof  
+
:<b>d. <section begin=req5d /><noinclude><translate></noinclude>Top Plate  
<section end=req5g /></translate></b>
+
<noinclude></translate></noinclude><section end=req5d /></b>
  
:<b>h. <translate><section begin=req5h />Shingles  
+
:<b>e. <section begin=req5e /><noinclude><translate></noinclude>Double Plate  
<section end=req5h /></translate></b>
+
<noinclude></translate></noinclude><section end=req5e /></b>
  
:<b>i. <translate><section begin=req5i />Window with Weight-bearing Header  
+
:<b>f. <section begin=req5f /><noinclude><translate></noinclude>Conventional Roof or Trusses  
<section end=req5i /></translate></b>
+
<noinclude></translate></noinclude><section end=req5f /></b>
  
:<b>j. <translate><section begin=req5j />Door with Weight-bearing Header  
+
:<b>g. <section begin=req5g /><noinclude><translate></noinclude>Felt Roof  
<section end=req5j /></translate></b>
+
<noinclude></translate></noinclude><section end=req5g /></b>
  
:<b>k. <translate><section begin=req5k />Fascia on Eaves
+
:<b>h. <section begin=req5h /><noinclude><translate></noinclude>Shingles 
<section end=req5k /></translate></b>
+
<noinclude></translate></noinclude><section end=req5h /></b>
  
:<b>l. <translate><section begin=req5l />Siding  
+
:<b>i. <section begin=req5i /><noinclude><translate></noinclude>Window with Weight-bearing Header  
<section end=req5l /></translate></b>
+
<noinclude></translate></noinclude><section end=req5i /></b>
  
[[Category:Honor Requirements|{{#titleparts:{{PAGENAME}}|1|3}}]]
+
:<b>j. <section begin=req5j /><noinclude><translate></noinclude>Door with Weight-bearing Header 
[[Category:Honor Requirements Revision 2|{{#titleparts:{{PAGENAME}}|1|3}}]]
+
<noinclude></translate></noinclude><section end=req5j /></b>
 +
 
 +
:<b>k. <section begin=req5k /><noinclude><translate></noinclude>Fascia on Eaves
 +
<noinclude></translate></noinclude><section end=req5k /></b>
 +
 
 +
:<b>l. <section begin=req5l /><noinclude><translate></noinclude>Siding 
 +
<noinclude></translate></noinclude><section end=req5l /></b>
 +
 
 +
<b>Note: <section begin=reqNote /><noinclude><translate></noinclude>
 +
<noinclude></translate></noinclude><section end=reqNote /></b>
 +
<section end=Body />
 +
 
 +
<noinclude><translate>
 +
[[Category:Honor Requirements|{{#titleparts:{{PAGENAME}}|1|2}}]]
 +
[[Category:Honor Requirements Revision 3|{{#titleparts:{{PAGENAME}}|1|2}}]]
 +
</translate></noinclude>

Revision as of 15:36, 31 December 2020

Other languages:
English • ‎español




Carpentry

Authority:
Category:
Skill Level:
Year Introduced:
Carpentry AY Honor.png



1. Describe the function of the following tools:

a. Band Saw

b. Belt Sander

c. Jig Saw

d. Miter Saw

e. Radial Arm Saw

f. Router

g. Shaper

2. Demonstrate how to use the following tools:

a. Block Plane

b. Circular Saw (cut a straight line)

c. Framing Square

d. Hammer

e. Hand Saw (cut a straight line)

f. Level

g. Measuring Tape

h. Nail Set

i. Plumb Bob

j. Wood Chisel

3. Describe the use of and distinguish between the following types of nails: 20 Penny, 16 Penny, 12 Penny, 8 Penny, 6 Penny, Finish, Brad, Roofing, Screw Nail, Sinker, Common, and Galvenized

4. Assist in erecting a building not less than 6x8 feet in ground dimensions with a gable roof and at least one door and one window, demonstrating ability to measure and use tools from requirement 2.

5. When building the above project, use all of these features:

a. Floor Joist

b. Sub Floor

c. Shoe Plate

d. Top Plate

e. Double Plate

f. Conventional Roof or Trusses

g. Felt Roof

h. Shingles

i. Window with Weight-bearing Header

j. Door with Weight-bearing Header

k. Fascia on Eaves

l. Siding

Note: